Download and Install EpsonNet to view printer on your Network.
Windows:
https://download.epson-biz.com/modules/pos/index.php?page=single_soft&cid=6047&scat=43&pcat=3
MAC: https://download.epson-biz.com/modules/pos/index.php?page=single_soft&cid=6008
Then Open Program - Windows Button>EpsonNet>EpsonNet Config
Then Follow Instructions Below:


7 Enable ePos. Highlight the printer in EpsonNet, Launch Browser, (Picture 1). Both User and
Password are epson or epson / Serial # of Printer (password) Go to EpsonNet Config for
M-i (Picture 2). Go to ePOS-Print link under Services. (Picture 3). Enable ePOS-Print setting by
changing the drop down to Enable and press the Send button (Picture 3). After you press send it will
ask you to reset the printer. After resetting test the print function. *You may have to allow Windows
security to access. It will be automatic pop-up.


8. In Rent It Biz go to: Admin>Current Site>Printers>New Printer (Upper Right), Name the Printer. In
Type, choose Receipt Printer. In Path, enter the IP Address that shows in EpsonNet then Press Save

9. In Terminals Tab, highlight terminal, choose receipt printer in Receipt Printer #1. If you print at 2 different
printers, add 2nd printer. Receipt printers must be assigned to a terminal before you can test print on the
Printers tab.
